Capital goods companies make the machinery, electrical equipment and engineered systems that other industries use, and infrastructure companies build or operate assets such as roads, railways, ports and power networks. This article explains how the sectors work, how such lists are commonly built, and gives dated results data for a set of listed companies. It is not a ranking or recommendation.
Sector report: Indian Infrastructure Sector Report (market size, drivers, regulation, risks and listed companies).
Government capex and the demand cycle
A large part of demand for construction, engineering and electrical equipment comes from public spending. In the Union Budget 2026-27, the PIB backgrounder puts public capital expenditure at about Rs 12.2 lakh crore, roughly 9% above the FY2026 Budget Estimate, and effective capex (including grants to states for creating capital assets) at about Rs 17.15 lakh crore, or 4.4% of GDP (Source: PIB, Union Budget 2026-27 materials, February 2026, as reported in summaries; figures should be checked against the Budget documents).
Capex announced in a budget becomes company revenue only after tendering, award and execution, which often takes several quarters. That is why analysts watch order inflow and order book data alongside budget numbers.
See what markets are pricing in
Live indices, sector moves and market breadth — the backdrop to every story we publish.
Capital goods: electrical and non-electrical
The sector is commonly split in two. Electrical equipment covers transformers, switchgear, cables, motors and power electronics, with demand linked to grid investment, power generation and industrial automation. Non-electrical equipment covers items such as boilers, compressors, pumps and engines, with demand tied more closely to private-sector manufacturing capex. Because private capex follows corporate confidence, this segment is often described as more cyclical.
Infrastructure sub-sectors
- Roads and engineering and construction (E&C): companies bid for contracts under models such as engineering-procurement-construction or hybrid annuity.
- Railways: project execution, consultancy and financing entities linked to Indian Railways' capex.
- Ports and logistics: asset-heavy operators whose revenue depends on cargo throughput and tariffs.
- Power: generation and regulated transmission, where returns are partly set by regulatory tariffs.
Latest results of selected listed companies
The tables show reported consolidated results for the quarter ended 30 September 2026 (Q2 FY27) against the same quarter a year earlier. The companies are examples spanning the sub-sectors above and were not selected by a performance ranking.
Capital goods
| Company | Q2 FY27 revenue (Rs crore) | YoY | Q2 FY27 net profit (Rs crore) | YoY |
|---|---|---|---|---|
| ABB India | 3,816 | +12.4% | 443 | +8.2% |
| Siemens | 5,886 | +11.2% | 504 | +3.9% |
| Polycab India | 9,987 | +53.1% | 990 | +42.9% |
| CG Power | 3,883 | +29.9% | 409 | +43.8% |
| BHEL | 9,553 | +24.3% | 821 | +119.0% |
| Thermax | 2,838 | +10.9% | 113 | -5.3% |
Engineering, construction, railways, ports and power
| Company | Q2 FY27 revenue (Rs crore) | YoY | Q2 FY27 net profit (Rs crore) | YoY |
|---|---|---|---|---|
| Larsen & Toubro | 81,056 | +16.8% | 5,949 | +27.2% |
| RVNL | 4,836 | -9.3% | 254 | +10.1% |
| Adani Ports | 11,610 | +16.1% | 3,682 | +18.0% |
| NTPC | 54,716 | +20.9% | 7,351 | +40.7% |
| Power Grid | 12,055 | +3.3% | 3,866 | +8.4% |
Source: FinEdge consolidated quarterly results as held in Wright Research's database (quarter ended 30 September 2026 versus quarter ended 30 September 2025), checked 23 November 2026. Net profit is as reported for the period and may include exceptional items. Inclusion in a table is not a recommendation.
Order book is a key operating measure for contractors. Larsen & Toubro reported a record Q2 FY27 order inflow of about Rs 1,47,665 crore and a consolidated order book of about Rs 8,53,514 crore on 30 September 2026, according to coverage of its results (company filing not directly retrieved; check the exchange filing). Order books at other companies are reported in their results presentations.
Get research like this in your inbox
The week’s research that mattered, in five minutes. Joined by 2L+ investors.
Metrics analysts commonly use for this sector
| Metric | What it shows |
|---|---|
| Order book to trailing revenue | How many years of revenue are already contracted |
| Order inflow versus revenue growth | Whether execution keeps pace with wins |
| Return on capital employed | Efficiency of capital in a capital-intensive business |
| Debt to equity and interest cover | Balance-sheet strain, especially for project developers |
| Working-capital days | Cash tied up in receivables and inventory, often stretched by government payment delays |
Cyclicality and risks
These sectors are cyclical. Public capex can slow in election periods or fiscal consolidation, land acquisition and clearances can delay projects, policy changes to tolls, tariffs or procurement can alter project returns, and commodity price swings affect margins on fixed-price contracts. Quarterly results also vary from lumpy project billing, as the Q2 versus Q1 differences in the tables above show for some companies.
How lists of "best" stocks are usually built
Articles that rank capital goods and infrastructure companies typically start from an index or sector classification, then filter on size and liquidity, and rank on a mix of growth, profitability, balance-sheet and valuation measures. Different lists use different inputs, periods and weights, so they reach different names. Any list is a snapshot: order books, margins and prices change every quarter, and a company's presence on a list does not mean it is suitable for any particular person.
Is your portfolio built for what’s coming?
Get a free AI-powered review of your holdings — risk, overlap and quality in minutes.
Reading quarterly results in this sector
Project revenue is recognised as work is completed, so a quarter with weather disruption or delayed site handovers can look weak even when the order book is healthy. Year-on-year comparisons are generally more informative than sequential ones. Margin changes can come from commodity costs, project mix or one-time claims. For regulated utilities such as transmission and generation, earnings follow the regulated asset base and tariff orders rather than order inflow.
This article is for educational purposes only and is not investment advice.