India has set a target of 500 GW of non-fossil fuel electricity capacity by 2030. This article summarises where installed renewable capacity stood in the latest data available in November 2026, based on figures from the Ministry of New and Renewable Energy (MNRE) as reported by industry publications. Figures differ slightly between outlets because of rounding, the date of the cut-off and the treatment of large hydro.
Installed capacity as at 30 September 2026
Saur Energy, citing MNRE data (published 8 October 2026), reports the following cumulative capacity as of 30 September 2026.
| Source | Installed capacity (GW) |
|---|---|
| Solar | 171.05 |
| Wind | 59.20 |
| Large hydro (incl. 7.43 GW pumped storage) | 52.06 |
| Nuclear | 8.78 |
| Total renewable capacity including large hydro | 299.25 |
| Renewable capacity excluding large hydro | 247.18 |
| Total non-fossil capacity including nuclear | 308.03 |
Within solar, the same report gives 125.65 GW ground-mounted, 33.41 GW grid-connected rooftop, 5.36 GW hybrid and 6.63 GW off-grid. Solar is about 57% of total renewable capacity including large hydro.
See what markets are pricing in
Live indices, sector moves and market breadth — the backdrop to every story we publish.
Latest solar figure: end of October 2026
SolarQuarter (12 November 2026), citing MNRE, reports installed solar capacity of about 174.5 GW at the end of October 2026, with about 3.5 GW added in October and about 38.7 GW added from January to October 2026. Its category split was 127.33 GW ground-mounted, 34.97 GW rooftop, 5.62 GW hybrid and 6.63 GW off-grid. A 22 November 2026 report from now.solar rounds the total to about 175 GW.
Additions in 2026
| Period | Addition | Source |
|---|---|---|
| April to September 2026 (H1 FY27), all renewables | 24.56 GW (solar 20.79 GW, wind 3.11 GW) | Saur Energy citing MNRE |
| January to September 2026, solar | about 35.2 GW (+19.5% year on year) | JMK Research citing MNRE |
| January to September 2026, wind | about 4.69 GW (-5.5% year on year) | JMK Research citing MNRE |
JMK Research (9 October 2026) also notes that utility-scale solar additions were about 12.1 GW in the first quarter, 6.9 GW in the second and 5.4 GW in the third quarter of 2026, so the pace of utility-scale additions slowed through the year while rooftop solar accounted for about a third of the January-September solar additions.
Get research like this in your inbox
The week’s research that mattered, in five minutes. Joined by 2L+ investors.
How the 500 GW target is defined
The 500 GW goal refers to installed non-fossil capacity (solar, wind, hydro, bioenergy and nuclear) by 2030, announced by India at COP26 in 2021, alongside meeting 50% of energy requirements from renewable sources. Installed capacity is not the same as generation: solar and wind run at lower capacity utilisation than thermal or nuclear plants, so a gigawatt of solar produces fewer units of electricity per year than a gigawatt of coal-fired capacity.
Based on the figures above, non-fossil capacity of 308.03 GW at 30 September 2026 compares with the 500 GW target, leaving about 192 GW difference over the remaining period to 2030. This is a simple arithmetic comparison, not a projection.
Drivers and constraints commonly cited
- Policy support: production-linked incentives for solar modules, the PM Surya Ghar rooftop scheme, renewable purchase obligations and transmission charge waivers for some projects.
- Manufacturing: growth of domestic module and cell capacity reduces import dependence.
- Grid and storage: transmission availability, curtailment risk, land and the need for storage to manage solar's daily profile are widely discussed constraints.
- Offtake and finance: distribution company payment and power-purchase agreement signing affect project pipelines.
Sources and how to check the data
MNRE publishes physical progress data on mnre.gov.in and the Central Electricity Authority publishes installed capacity reports on cea.nic.in. Secondary outlets used here are Saur Energy (8 October 2026), JMK Research & Analytics (9 October 2026) and SolarQuarter (12 November 2026). We were unable to verify these figures directly on the MNRE dashboard, so exact values should be confirmed there.
Follow this sector’s live moves
Sector-level performance across Indian markets, updated through the day.
Frequently asked questions
What counts toward the 500 GW goal? All non-fossil capacity, including large hydro and nuclear.
Why do totals differ between sources? Some include large hydro and some do not, and cut-off dates vary.
Is capacity the same as electricity generated? No; generation depends on capacity utilisation, weather and grid dispatch.
This article is for educational purposes only and is not investment advice.